FANYATOP Brand DD series diesel pile hammers are over 20 Years’ Experience in Design, Manufacturing and Applying,developed full series guide rod diesel pile hammers.popular models :DD25 DD35 DD45 DD55,DD65,DD75 DD85..DD200.
FANYATOP Brand DD serie guide rod diesel hammer is pressed onto the pile cap with a plunger as the hammer seat, and lifted and lowered along two guide rods with a cylinder as the hammer head. When driving piles, first lift the pile into the pile frame gantry, then place the diesel hammer on the top of the pile, lower the hook to lift the cylinder, and release the hook to let the cylinder fall into the plunger, compressing the air enclosed in the cylinder. The cylinder continues to fall until the pressure pin outside the cylinder pushes the rocker arm of the fuel pump on the hammer seat. When the fuel pump sprays oil mist into the cylinder, it encounters high-temperature gas above the ignition point and immediately ignites. The explosive force impacts downwards, causing the pile to sink and push upwards, causing the cylinder to rise again. When the cylinder falls down along the guide rod again, the second impact cycle begins.
No | Technical data | Unit | Model DD55 |
1 | Cylinder mass | kg | 5500 |
2 | Max Cylinder stroke | m | 3.0 |
3 | Impact Frequency | l/min | 35-50 |
4 | Max Energy | kj | 157 |
5 | Force of explosion pile | kn | 1690 |
6 | Suitable for driving piles | kg | 13000 |
7 | Reduction ration |
| 22 |
8 | Oil consumption | L/h | 16.5 |
9 | Hammer Mass |
| 10000kg |
10 |
Guide Distance | mm | 330 |
Packaging & Shipping
The Standard Set Of Pile HammerInclude:
- diesel pile hammer
- drive cap
- Accessories.
We packed with export standard steel carrier and ship by 20GP or 40GP container
Payment Term:
1. T/T,L/C at Sight,,or other payment terms according to actual situations.
2. Trade term: EXW, FOB, CNF, CIF all accepted.
Business Support And Service
1. Suggest the best solution(suitable model) after study clients’ project and pile information(geological report,pile type,pile lenth,pile size,match with what machinery....)
2. Provide drawings for customers to confirm within three days after signing the contract for non-standard products, and produce according to the drawings(pile leader and pile cap)
3. Every diesel pile hammer will be tested well before shippment. Every single product has its own Production Code, Certification of Quality and Operation Instruction
4. Timely parts service:enough parts stock
5. Our engineers can come to client jobsite for technical support .24 hours After-sale service hotline 0516-86225766